How decorating fits around other trades and the wider programme
Decoration is normally one of the last trades on site, and getting the sequencing right avoids redoing finished work. Plastering needs time to dry out fully before painting, typically around a week per coat of skim in good conditions and considerably longer in cold, damp or poorly ventilated rooms, so we won't rush a mist coat onto plaster that's still curing, as it leads to visible flashing, blistering or a patchy sheen appearing weeks later once the wall has fully dried out. On refurbishment projects we coordinate with the other trades on site so decoration happens after first-fix electrics, plumbing and any flooring subfloor work, but before carpets, engineered wood or other delicate flooring goes down, since paint spatter, sanding dust and plaster dust are far easier to manage before finishes are laid rather than after. Where a job involves knocking through a wall, removing a chimney breast, or fitting a new ceiling after water damage, we usually pick up the plastering and decorating once the structural work and first fix are signed off, so the client isn't managing separate contractors and separate access visits for each stage of what is really one project. For occupied homes we plan the work room by room so at least part of the property stays usable throughout rather than the whole place being out of action at once, and for landlords managing a turnaround between tenancies we can compress the overall programme by running plastering, drying time and decoration back to back with minimal gaps, rather than leaving the property empty and unlet for longer than necessary between each trade. We also work around trades finishing at the same time as decoration starts, such as electricians who need to remove and refit socket and switch plates around freshly painted walls, or kitchen fitters where it's usually better to paint the walls before units go in rather than cutting in awkwardly around finished cabinetry afterwards. On jobs needing external scaffold, we coordinate access with the scaffolding contractor so the tower goes up once and covers both any exterior repair work and the decoration, rather than two separate hire periods. Before handover we do a final snag walk-through with the client to pick up any missed cutting-in, touch-ups or marks left by other trades during the final stages, so the property is genuinely ready rather than needing a follow-up visit for small items.